DN66 Rehabilitations

Project details Length: 46.60 km Designer: Hyder Consulting Ltd Consultant: Hyder Consulting Ltd Constructor: Asocierea Copisa Constructora Pirenaica si SC Coradi Trade Srl Period: 2013-2017 No of teams: 2 teams Equipment: Total Station Leica 1200, Level Geomax ZDL700 Work stages Marking the axle of the road. Marking boundaries to the road. Marking and raising of…

Share project:

Road rehabilitation

Project details Length: 79.500 km Designer: Inocsa Ingenieria SL Consultant: Spea Ingegneria Europea Spa Italia Constructor: Strabag AG, Austria Period: 2011 – 2012 No of teams: 4 teams Equipment: Total Station Leica 1203, Total Station Leica 705, Gps Leica 530, Level Leica Runner Work stages Designing and executing topography topography. Calculations and rigorous network compensation…

Share project:

Highway Arad – Timisoara

Project details Lenght: 32.25 km Designer: Egis Route Scetauroute / Egis International SA Consultant: Egis Route Scetauroute / Egis International SA Constructor: JV FCC Construction SA / Astaldi SA Period: 2010 – 2011 and 2013 No of teams: 2 teams Equipment used: Gps Leica 1200, Gps Leica 530, Level Leica NA720 Stages of works Surveys and stake out of levels as per the execution…

Share project:

Tracking Construction over time

Project details Beneficiary: SNGN Romgaz SA Period: 2013-2016 No of teams: 1 team Equipments: Electronic Level Leica DNA 10, Total Station Leica TCRM 1203 Stages of work Verification of the support network, its calculation and compensation. Performing compaction measurements topographic-geodesic and displacement. Compiling the documentation with the results of the measurements performed. Share project:

Share project:

Highway A1

Project details Length: 82.070 km Designer: SC Aecom Ingineria SRL Consultant: SC Consitrans SRL Constructor: SC Strabag SRL Period: 2011 – 2015 No of teams: 4 teams Equipment used: Gps Magellan Pro Mark 3, Gps Leica 530, Total Station Leica 1200 Stages of works Designing and marking on the ground topographic support network. Determining planimetric…

Share project:

Rehabilitation National Road 1H

Project details Lenght: 26 + 510 km Designer: Inocsa Ingenieria SL Consultant: SC PRIMACONS GROUP SRL Constructor: Asocierea OHL ZS, a.s. – PEYBER HISPANICA S.L. – S.C. SOCIETATEA DE INTRETINERE SI REPARATII DRUMURI TIMISOARA S.A. Period: 2011 – 2016 No of teams: 3 teams Equipments: Electronic Leica Runner, Total Staions: Pentax, Leica 307, Leica 1203, Leica…

Share project: